Features
Request more info
Price/Sqft Range
1200 sqft - 1399 sqft
Avg Price/Sqft
$462 / sq. ft.
Completed
Built: 2019
Building Scale
Floors: 1 | Total Units: 136
Building Type
Townhouse
Property Management
Built in 2019
Condo Corp
DCC-317
Date Registered
Aug 22, 2019
Marshall Homes completed Centre Point Towns in 2019. The project consists of 136 units within three-storey townhouse structures located in Pickering's urban core.
Interior layouts use open-concept designs to maximise floor space. These configurations provide movement between kitchen, dining, and living areas.
The three-storey design serves as a residential option between high-rise units and detached housing. The project is located along the Kingston Road corridor to support local transit and retail infrastructure.
The Town Centre location provides proximity to transit and retail services. Residents are within walking distance of dining options such as Sakura Sushi and 6ixside Burger.
Nearby educational institutions include École élémentaire Ronald-Marion and Pine Ridge Secondary School. The site is positioned so daily errands can be completed without a vehicle.
The area is occupied by families and professionals who require access to regional transit and school infrastructure.
Marshall Homes completed Centre Point Towns in 2019. The firm develops townhouse communities in the Durham region. Their projects focus on integration with existing transit networks and established retail centres.
Average
Median